STEP 1: SLIDE THE CLIPS UNDER THE TILE

After applying the tile adhesive, the clips are slid under the tile. Depending on the size of the tile, you can place one or more clips per side. Tap the tile.

Place the next tile after installing spacers.

* Depending on tile size, it may be necessary to use multiple spacers on each side.

* For tiles of approximately 20 cm, the use of two spacers per side is recommended.

However, 1mm spacers are used for 1 mm tile joints, 2 mm for 2 mm joints and 3 mm for 3 mm joints.

 

STEP 2: INSERT THE WEDGES

Slide the wedge into the clip opening when the tiles have been completely levelled.

Manually insert the wedges in the clips that were slid under the tiles. Carefully secure the wedges in the clips being careful not to exceed the breaking point.

STEP 3: USE THE PLIERS

Use the special pliers to simplify the insertion of the wedge.

STEP 4: REMOVE THE CLIP

Once fixed in place, allow for a curing time of 24 hours!

Once the tile adhesive is completely cured, you can remove the visible part of the clips. To do so, use a rubber hammer or your shoe in the direction of the joint.

* If you use a quick adhesive, wait until the adhesive has completely hardened.